🔄
Self-Inflating Sky Bunk™ – Instructions

Self-Inflating Sky Bunk™ – Instructions

✈️ Self-Inflating Sky Bunk Instructions

Create a lie-flat bed for your little one in under 30 seconds — no pump needed.


🔄 Know Your Model

We now have two versions of the Self-Inflating Sky Bunk:

1. Green Cap Version

  • Pump is located on the leg of the Sky Bunk

  • Twist + pull to remove the pump

  • Type-C charging (can charge attached or removed)

  • Red light = charging, blue = fully charged

  • Must use the included cable to ensure correct charging

2. Grey Cap Version (From October 2025)

  • Pump is located on the top of the Sky Bunk for easy access in-flight

  • Pull to remove (no twisting)

  • Must be removed to charge

  • Charging takes ~1 hour

  • Switch is orange — flick to inflate, flick again to stop

  • Tip: Pump can be inserted backwards post-flight to remove final air (see Deflation section)


🧳 Preparation

Stretch and Test Your Sky Bunk

  • Remove from packaging and fully stretch it out

  • Inflate and leave overnight (or for 12 hours) to test for leaks

  • If it holds air, register your warranty within 72 hours of receiving

Click here to register your lifetime warranty. 


💺 Inflation & Use

Inflate While in Place

  • Set up your Sky Bunk on the plane with the legs hanging over the seat edge

  • Ensure it's correctly positioned before inflating — it inflates quickly

To Inflate:

Green Cap Version:

  • Twist and remove the green cap

  • Double-click the button to start inflation

  • Wait until it feels firm or the motor sound changes

  • Click once to stop, and quickly reattach the green cap (twist tightly)

Grey Cap Version:

  • Remove the grey cap

  • Flick the orange switch to turn on

  • Flick again to stop once inflated

  • Quickly reinsert and twist the grey cap back on to seal

During Use:

  • The Sky Bunk is designed for use once the seatbelt sign is off

  • You can top up the air mid-flight if needed by briefly turning the pump back on


🔧 Safety Tip

Ensure air safety release valve (red, orange or black) is twisted fully clockwise
Then, twist back slightly (about 2cm) to activate its auto-release function for in-flight pressure changes


🧳 Deflation & Packing

Step 1: Rapid Deflation

  • Pull open the Rapid Release Valve

  • Press the Sky Bunk down — air will begin escaping quickly (~3 seconds)

Optional:

  • Twist and remove the air safety release valve to speed up deflation

Step 2: Compress

  • Roll or press the Sky Bunk from one end, pushing all air toward open valves

  • If you have the grey cap model, remove the pump and insert it backwards

    • Turn on to vacuum the last bits of air

    • You will not see the orange switch, and the pump will only insert halfway — do not force it

    • Once complete, remove pump and store

Step 3: Fold & Pack

  • Replace all valves, fold the Sky Bunk, and pack for storage

  • Continue pressing out air as you fold to keep it compact


💡 Troubleshooting

If it’s not inflating:

  • Check battery is charged

  • Press the button/switch multiple times

  • Make sure all caps and plugs are removed or open

If it’s leaking air:

  • Ensure all valves (especially the air safety release) are fully sealed

  • Some air loss mid-flight is normal — top up with a quick burst of inflation